S-34.1, r. 1 - Regulation respecting petroleum exploration, production and storage in a body of water

Full text
147. The maximum pressure applicable to the casings must be calculated to ensure control of the well. It must be posted on the activity site.
O.C. 1251-2018, s. 147.
In force: 2018-09-20
147. The maximum pressure applicable to the casings must be calculated to ensure control of the well. It must be posted on the activity site.
O.C. 1251-2018, s. 147.